2019-03-20
The Greener MR Tanker

The Company signed a ship design contract with CSSC CHENGXI Shipyard in JiangYin, China. The goal of the project is to future lower the daily fuel oil consumption of the 50,000 DWT ship to a new level. Also structural optimization is also the main challenge of the project, with a improved structural reliability, the ship construction cost and construction period is expected to improve 5% to 10% per ship.